Division KELLER
Please choose your language:

Plant safety

We bring your safety technology up to date

Being the operator, the customer is always responsible for the compliance with the machinery and plant safety. He must ensure that the equipment complies with the Machinery Directives 2006/42/EC.
 
KELLER offers the auditing of existing plants and machines and creates an accident protection plan as a result, which can also be implemented afterwards.
 

In addition to the risk assessment, these include:

  • the creation of accident protection drawings
  • the listing of all required safety components
  • the testing and implementation of two-channel electrical wiring
  • the final CE measurement of the cabling on site

In addition, the documentation and the operating manual must be an integral part of a declaration of incorporation or a declaration of conformity. The operator can usually provide these.

Feel free to contact us and we will make you a non-binding offer.
INDICE 6 Login
© 2001-2024 – Internetagentur – Wrocklage Werbewerkstatt